Electrician prices in El Paso, TX
| Project | Time | Typical cost | Range |
| Standard service call (diagnosis + minor repair) |
1–2 hours |
$161 |
$132 – $193 |
| Add a new outlet (15–20 amp, dedicated) |
1–3 hours |
$186 |
$152 – $223 |
| Ceiling fan install (existing wiring) |
1–2 hours |
$176 |
$145 – $211 |
| Panel upgrade (100A → 200A, includes permit) |
1 day |
$1,785 |
$1,464 – $2,142 |
| Level 2 EV charger install (50A circuit, hardwired) |
4–6 hours |
$707 |
$580 – $849 |
| Single room rewire (avg ~3 outlets + 1 fixture) |
1 day |
$663 |
$544 – $796 |
| Whole-house rewire (1500–2000 sq ft) |
5–10 days |
$6,144 |
$5,038 – $7,373 |
Local rate = BLS national mean × 2.4 markup × (TX COL 92.7/100). Materials adjusted by the same factor.
What a electrician in El Paso actually does
A licensed electrician handles anything attached to the breaker panel or carrying line voltage (120V/240V). A standard residential service call begins with the panel: the electrician verifies the main breaker rating, looks for double-tapped breakers, checks for AFCI/GFCI compliance in the right rooms, and tests for proper grounding at the service drop. Outlet, switch, and fixture work is straightforward. Panel upgrades, sub-panel adds, EV-charger installs, and whole-house rewires require a permit, a load calculation (NEC Article 220), and an inspection by the local AHJ before the panel is energized.
Questions to ask before you hire in TX
- What is your master or journeyman license number, and is it active in this state?
- Will the work be done by a licensed electrician or by a helper with the licensee on call?
- Are you pulling the permit and scheduling inspection?
- Does the quote include any required panel-load calculations or breaker upgrades?
- What's the warranty on labor — and on the equipment you're installing?
- Are AFCI and GFCI breakers included where code now requires them?
Cash-only quotes, "I can do it without a permit so it's cheaper," and any pressure to upsize a panel without a written load calculation explaining why.
6 licensed electricians in El Paso
Express Current
📍 6853 Pine St, El Paso, TX 79901
★ 4.6 / 5 · 154 reviews · 30 years in business
✓ Licensed ✓ Insured 24/7 Emergency 30 yrs
Specialties: Ceiling fan, EV charger install, Knob-and-tube replacement, Smoke detector
Lee Wired
📍 7717 Washington Ter, El Paso, TX 79902
★ 5.0 / 5 · 160 reviews · 10 years in business
✓ Licensed ✓ Insured BBB A- 24/7 Emergency 10 yrs
Specialties: Smoke detector, Generator install, Knob-and-tube replacement, EV charger install
Veteran Electric
📍 5266 Sycamore Dr, El Paso, TX 79903
★ 4.4 / 5 · 7 reviews · 37 years in business
✓ Licensed ✓ Insured 24/7 Emergency 37 yrs
Specialties: Ceiling fan, Surge protection, Knob-and-tube replacement, EV charger install, Outlet install
El Paso Wired
📍 8113 Maple Ct, El Paso, TX 79901
★ 4.8 / 5 · 260 reviews · 6 years in business
✓ Licensed ✓ Insured 24/7 Emergency 6 yrs
Specialties: Outlet install, Knob-and-tube replacement, Generator install, Panel upgrade, EV charger install
Lee Sparks
📍 4338 Garden Pkwy, El Paso, TX 79902
★ 5.0 / 5 · 97 reviews · 10 years in business
✓ Licensed ✓ Insured BBB A 10 yrs
Specialties: EV charger install, Smoke detector, Whole-house rewire
Hill Wattage
📍 7891 Main St, El Paso, TX 79903
★ 4.9 / 5 · 282 reviews · 37 years in business
✓ Licensed ✓ Insured BBB A 24/7 Emergency 37 yrs
Specialties: EV charger install, Outlet install, Panel upgrade, Generator install, Recessed lighting
Looking for a specific ZIP?
Seasonal electrical checklist for El Paso homeowners
Spring
- Test every GFCI outlet (kitchen, baths, garage, exterior) using the on-device test/reset button.
- Test smoke and CO detectors; replace batteries on any unit older than 10 years.
- Inspect outdoor lighting and replace bulbs and weatherproof gaskets that have degraded over winter.
- Walk the panel: look for rust, scorch marks, or warm breakers — any of these is a service call.
Summer
- Inspect the exterior service drop and the meter base for storm damage; never touch the wires yourself.
- If you run multiple high-draw appliances (window AC, EV charger, pool pump), have an electrician verify your panel can handle the simultaneous load.
Fall
- Test the whole-home surge protector (or have one installed before winter storms).
- Inspect generator transfer switch and run the generator under load for 20 minutes.
- Replace outdoor incandescent bulbs with LEDs before holiday-light season.