Electrician prices in Lakewood, CO
| Project | Time | Typical cost | Range |
| Standard service call (diagnosis + minor repair) |
1–2 hours |
$183 |
$150 – $219 |
| Add a new outlet (15–20 amp, dedicated) |
1–3 hours |
$210 |
$172 – $252 |
| Ceiling fan install (existing wiring) |
1–2 hours |
$200 |
$164 – $240 |
| Panel upgrade (100A → 200A, includes permit) |
1 day |
$2,022 |
$1,658 – $2,426 |
| Level 2 EV charger install (50A circuit, hardwired) |
4–6 hours |
$801 |
$657 – $961 |
| Single room rewire (avg ~3 outlets + 1 fixture) |
1 day |
$751 |
$616 – $901 |
| Whole-house rewire (1500–2000 sq ft) |
5–10 days |
$6,959 |
$5,707 – $8,351 |
Local rate = BLS national mean × 2.4 markup × (CO COL 105.0/100). Materials adjusted by the same factor.
What a electrician in Lakewood actually does
A licensed electrician handles anything attached to the breaker panel or carrying line voltage (120V/240V). A standard residential service call begins with the panel: the electrician verifies the main breaker rating, looks for double-tapped breakers, checks for AFCI/GFCI compliance in the right rooms, and tests for proper grounding at the service drop. Outlet, switch, and fixture work is straightforward. Panel upgrades, sub-panel adds, EV-charger installs, and whole-house rewires require a permit, a load calculation (NEC Article 220), and an inspection by the local AHJ before the panel is energized.
Questions to ask before you hire in CO
- What is your master or journeyman license number, and is it active in this state?
- Will the work be done by a licensed electrician or by a helper with the licensee on call?
- Are you pulling the permit and scheduling inspection?
- Does the quote include any required panel-load calculations or breaker upgrades?
- What's the warranty on labor — and on the equipment you're installing?
- Are AFCI and GFCI breakers included where code now requires them?
Cash-only quotes, "I can do it without a permit so it's cheaper," and any pressure to upsize a panel without a written load calculation explaining why.
5 licensed electricians in Lakewood
Atlantic Amp Pros
📍 4471 Oak Ter, Lakewood, CO 80226
★ 3.8 / 5 · 324 reviews · 37 years in business
✓ Licensed ✓ Insured BBB A+ 24/7 Emergency 37 yrs
Specialties: Ceiling fan, Generator install, Whole-house rewire, Knob-and-tube replacement, Panel upgrade
Lakewood Sparks
📍 4188 Spring Ct, Lakewood, CO 80232
★ 3.9 / 5 · 124 reviews · 6 years in business
✓ Licensed ✓ Insured BBB A- 24/7 Emergency 6 yrs
Specialties: Whole-house rewire, EV charger install, Knob-and-tube replacement
Mitchell Circuit
📍 6779 Pine St, Lakewood, CO 80214
★ 4.1 / 5 · 365 reviews · 31 years in business
✓ Licensed ✓ Insured 24/7 Emergency 31 yrs
Specialties: Knob-and-tube replacement, EV charger install, Generator install, Recessed lighting, Whole-house rewire
Coleman Circuit
📍 3232 Oak Rd, Lakewood, CO 80226
★ 4.5 / 5 · 21 reviews · 11 years in business
✓ Licensed ✓ Insured BBB A- 11 yrs
Specialties: Generator install, Panel upgrade, Ceiling fan, Recessed lighting, Smoke detector
Perry Circuit
📍 1371 Meadow Ln, Lakewood, CO 80232
★ 4.8 / 5 · 375 reviews · 34 years in business
✓ Licensed ✓ Insured 24/7 Emergency 34 yrs
Specialties: Generator install, Smoke detector, Panel upgrade
Looking for a specific ZIP?
Seasonal electrical checklist for Lakewood homeowners
Spring
- Test every GFCI outlet (kitchen, baths, garage, exterior) using the on-device test/reset button.
- Test smoke and CO detectors; replace batteries on any unit older than 10 years.
- Inspect outdoor lighting and replace bulbs and weatherproof gaskets that have degraded over winter.
- Walk the panel: look for rust, scorch marks, or warm breakers — any of these is a service call.
Summer
- Inspect the exterior service drop and the meter base for storm damage; never touch the wires yourself.
- If you run multiple high-draw appliances (window AC, EV charger, pool pump), have an electrician verify your panel can handle the simultaneous load.
Fall
- Test the whole-home surge protector (or have one installed before winter storms).
- Inspect generator transfer switch and run the generator under load for 20 minutes.
- Replace outdoor incandescent bulbs with LEDs before holiday-light season.