Electrician prices in Orlando, FL
| Project | Time | Typical cost | Range |
| Standard service call (diagnosis + minor repair) |
1–2 hours |
$175 |
$144 – $210 |
| Add a new outlet (15–20 amp, dedicated) |
1–3 hours |
$202 |
$165 – $242 |
| Ceiling fan install (existing wiring) |
1–2 hours |
$191 |
$157 – $230 |
| Panel upgrade (100A → 200A, includes permit) |
1 day |
$1,939 |
$1,590 – $2,327 |
| Level 2 EV charger install (50A circuit, hardwired) |
4–6 hours |
$768 |
$630 – $922 |
| Single room rewire (avg ~3 outlets + 1 fixture) |
1 day |
$720 |
$591 – $864 |
| Whole-house rewire (1500–2000 sq ft) |
5–10 days |
$6,674 |
$5,473 – $8,009 |
Local rate = BLS national mean × 2.4 markup × (FL COL 100.7/100). Materials adjusted by the same factor.
What a electrician in Orlando actually does
A licensed electrician handles anything attached to the breaker panel or carrying line voltage (120V/240V). A standard residential service call begins with the panel: the electrician verifies the main breaker rating, looks for double-tapped breakers, checks for AFCI/GFCI compliance in the right rooms, and tests for proper grounding at the service drop. Outlet, switch, and fixture work is straightforward. Panel upgrades, sub-panel adds, EV-charger installs, and whole-house rewires require a permit, a load calculation (NEC Article 220), and an inspection by the local AHJ before the panel is energized.
Questions to ask before you hire in FL
- What is your master or journeyman license number, and is it active in this state?
- Will the work be done by a licensed electrician or by a helper with the licensee on call?
- Are you pulling the permit and scheduling inspection?
- Does the quote include any required panel-load calculations or breaker upgrades?
- What's the warranty on labor — and on the equipment you're installing?
- Are AFCI and GFCI breakers included where code now requires them?
Cash-only quotes, "I can do it without a permit so it's cheaper," and any pressure to upsize a panel without a written load calculation explaining why.
5 licensed electricians in Orlando
Taylor Voltage
📍 5202 Spring Rd, Orlando, FL 32801
★ 3.9 / 5 · 225 reviews · 26 years in business
✓ Licensed ✓ Insured BBB A- 24/7 Emergency 26 yrs
Specialties: Outlet install, Whole-house rewire, Panel upgrade
Evans Voltage
📍 2309 Lake Ct, Orlando, FL 32805
★ 5.0 / 5 · 64 reviews · 33 years in business
✓ Licensed ✓ Insured 24/7 Emergency 33 yrs
Specialties: Outlet install, EV charger install, Ceiling fan, Panel upgrade
Cox Sparks
📍 8373 Cherry Dr, Orlando, FL 32806
★ 4.2 / 5 · 326 reviews · 19 years in business
✓ Licensed ✓ Insured BBB A- 24/7 Emergency 19 yrs
Specialties: Outlet install, Surge protection, Ceiling fan, Whole-house rewire, Panel upgrade
Orlando Power
📍 5692 Lincoln Ct, Orlando, FL 32801
★ 3.6 / 5 · 132 reviews · 7 years in business
✓ Licensed ✓ Insured 24/7 Emergency 7 yrs
Specialties: Whole-house rewire, Generator install, EV charger install, Recessed lighting, Outlet install
Orlando Electric
📍 485 Meadow Blvd, Orlando, FL 32805
★ 3.9 / 5 · 402 reviews · 22 years in business
✓ Licensed ✓ Insured BBB A 22 yrs
Specialties: Panel upgrade, Whole-house rewire, Surge protection, Smoke detector, Outlet install
Looking for a specific ZIP?
Seasonal electrical checklist for Orlando homeowners
Spring
- Test every GFCI outlet (kitchen, baths, garage, exterior) using the on-device test/reset button.
- Test smoke and CO detectors; replace batteries on any unit older than 10 years.
- Inspect outdoor lighting and replace bulbs and weatherproof gaskets that have degraded over winter.
- Walk the panel: look for rust, scorch marks, or warm breakers — any of these is a service call.
Summer
- Inspect the exterior service drop and the meter base for storm damage; never touch the wires yourself.
- If you run multiple high-draw appliances (window AC, EV charger, pool pump), have an electrician verify your panel can handle the simultaneous load.
Fall
- Test the whole-home surge protector (or have one installed before winter storms).
- Inspect generator transfer switch and run the generator under load for 20 minutes.
- Replace outdoor incandescent bulbs with LEDs before holiday-light season.