★ Trusted by 84,000+ homeowners — verified contractor reviews Need a pro now? 1-888-555-FIXR

HomeCitiesPasadena, CA › Electrical

⚡ Electrical · Pasadena

Average Electrician Cost in Pasadena, CA

A electrician in Pasadena charges roughly $114/hour — driven by the BLS OEWS national mean hourly wage of $34.40 for SOC 47-2111, the CA cost-of-living index of 137.6, and the standard 2.4× contractor markup. Below: project-by-project pricing, then 3 licensed local pros.

Electrician prices in Pasadena, CA

ProjectTimeTypical costRange
Standard service call (diagnosis + minor repair) 1–2 hours $239 $196 – $287
Add a new outlet (15–20 amp, dedicated) 1–3 hours $275 $226 – $330
Ceiling fan install (existing wiring) 1–2 hours $262 $215 – $314
Panel upgrade (100A → 200A, includes permit) 1 day $2,650 $2,173 – $3,180
Level 2 EV charger install (50A circuit, hardwired) 4–6 hours $1,050 $861 – $1,260
Single room rewire (avg ~3 outlets + 1 fixture) 1 day $984 $807 – $1,181
Whole-house rewire (1500–2000 sq ft) 5–10 days $9,120 $7,479 – $10,944

Local rate = BLS national mean × 2.4 markup × (CA COL 137.6/100). Materials adjusted by the same factor.

What a electrician in Pasadena actually does

A licensed electrician handles anything attached to the breaker panel or carrying line voltage (120V/240V). A standard residential service call begins with the panel: the electrician verifies the main breaker rating, looks for double-tapped breakers, checks for AFCI/GFCI compliance in the right rooms, and tests for proper grounding at the service drop. Outlet, switch, and fixture work is straightforward. Panel upgrades, sub-panel adds, EV-charger installs, and whole-house rewires require a permit, a load calculation (NEC Article 220), and an inspection by the local AHJ before the panel is energized.

Questions to ask before you hire in CA

  1. What is your master or journeyman license number, and is it active in this state?
  2. Will the work be done by a licensed electrician or by a helper with the licensee on call?
  3. Are you pulling the permit and scheduling inspection?
  4. Does the quote include any required panel-load calculations or breaker upgrades?
  5. What's the warranty on labor — and on the equipment you're installing?
  6. Are AFCI and GFCI breakers included where code now requires them?
Cash-only quotes, "I can do it without a permit so it's cheaper," and any pressure to upsize a panel without a written load calculation explaining why.

3 licensed electricians in Pasadena

Pasadena Amp Pros

📍 1968 Lake Blvd, Pasadena, CA 91101
★ 4.0 / 5 · 24 reviews · 10 years in business
✓ Licensed ✓ Insured BBB A 24/7 Emergency 10 yrs
Specialties: Knob-and-tube replacement, Outlet install, Ceiling fan

Quality Circuit

📍 3719 Lincoln St, Pasadena, CA 91106
★ 4.0 / 5 · 210 reviews · 8 years in business
✓ Licensed ✓ Insured 8 yrs
Specialties: Whole-house rewire, Smoke detector, Generator install, Knob-and-tube replacement

Superior Wired

📍 3225 Hill Pkwy, Pasadena, CA 91125
★ 4.1 / 5 · 201 reviews · 27 years in business
✓ Licensed ✓ Insured BBB A+ 24/7 Emergency 27 yrs
Specialties: Surge protection, EV charger install, Whole-house rewire, Outlet install

Looking for a specific ZIP?

Seasonal electrical checklist for Pasadena homeowners

Spring

  • Test every GFCI outlet (kitchen, baths, garage, exterior) using the on-device test/reset button.
  • Test smoke and CO detectors; replace batteries on any unit older than 10 years.
  • Inspect outdoor lighting and replace bulbs and weatherproof gaskets that have degraded over winter.
  • Walk the panel: look for rust, scorch marks, or warm breakers — any of these is a service call.

Summer

  • Inspect the exterior service drop and the meter base for storm damage; never touch the wires yourself.
  • If you run multiple high-draw appliances (window AC, EV charger, pool pump), have an electrician verify your panel can handle the simultaneous load.

Fall

  • Test the whole-home surge protector (or have one installed before winter storms).
  • Inspect generator transfer switch and run the generator under load for 20 minutes.
  • Replace outdoor incandescent bulbs with LEDs before holiday-light season.
📞 Get a Free Local Estimate →