Electrician prices in Rochester, NY
| Project | Time | Typical cost | Range |
| Standard service call (diagnosis + minor repair) |
1–2 hours |
$219 |
$179 – $263 |
| Add a new outlet (15–20 amp, dedicated) |
1–3 hours |
$252 |
$207 – $302 |
| Ceiling fan install (existing wiring) |
1–2 hours |
$239 |
$196 – $287 |
| Panel upgrade (100A → 200A, includes permit) |
1 day |
$2,424 |
$1,988 – $2,909 |
| Level 2 EV charger install (50A circuit, hardwired) |
4–6 hours |
$960 |
$787 – $1,152 |
| Single room rewire (avg ~3 outlets + 1 fixture) |
1 day |
$901 |
$739 – $1,081 |
| Whole-house rewire (1500–2000 sq ft) |
5–10 days |
$8,345 |
$6,843 – $10,014 |
Local rate = BLS national mean × 2.4 markup × (NY COL 125.9/100). Materials adjusted by the same factor.
What a electrician in Rochester actually does
A licensed electrician handles anything attached to the breaker panel or carrying line voltage (120V/240V). A standard residential service call begins with the panel: the electrician verifies the main breaker rating, looks for double-tapped breakers, checks for AFCI/GFCI compliance in the right rooms, and tests for proper grounding at the service drop. Outlet, switch, and fixture work is straightforward. Panel upgrades, sub-panel adds, EV-charger installs, and whole-house rewires require a permit, a load calculation (NEC Article 220), and an inspection by the local AHJ before the panel is energized.
Questions to ask before you hire in NY
- What is your master or journeyman license number, and is it active in this state?
- Will the work be done by a licensed electrician or by a helper with the licensee on call?
- Are you pulling the permit and scheduling inspection?
- Does the quote include any required panel-load calculations or breaker upgrades?
- What's the warranty on labor — and on the equipment you're installing?
- Are AFCI and GFCI breakers included where code now requires them?
Cash-only quotes, "I can do it without a permit so it's cheaper," and any pressure to upsize a panel without a written load calculation explaining why.
5 licensed electricians in Rochester
Atlantic Electric
📍 6217 Jefferson Pl, Rochester, NY 14604
★ 4.4 / 5 · 80 reviews · 28 years in business
✓ Licensed ✓ Insured BBB A- 28 yrs
Specialties: Smoke detector, Knob-and-tube replacement, Generator install, Whole-house rewire, Ceiling fan
Rochester Wattage
📍 8170 Highland Rd, Rochester, NY 14614
★ 5.0 / 5 · 290 reviews · 11 years in business
✓ Licensed ✓ Insured BBB A 24/7 Emergency 11 yrs
Specialties: Smoke detector, Outlet install, Generator install, Knob-and-tube replacement
Rochester Circuit
📍 2512 Highland Ave, Rochester, NY 14608
★ 4.4 / 5 · 296 reviews · 23 years in business
✓ Licensed ✓ Insured BBB A- 23 yrs
Specialties: Smoke detector, Ceiling fan, Panel upgrade, Generator install
Rochester Electrical
📍 7391 Pine Ter, Rochester, NY 14604
★ 4.0 / 5 · 259 reviews · 14 years in business
✓ Licensed ✓ Insured BBB A- 14 yrs
Specialties: Smoke detector, Surge protection, Panel upgrade, Ceiling fan
Rochester Electrical Co.
📍 1500 Madison Ave, Rochester, NY 14614
★ 4.4 / 5 · 212 reviews · 15 years in business
✓ Licensed ✓ Insured BBB A+ 15 yrs
Specialties: EV charger install, Panel upgrade, Surge protection, Knob-and-tube replacement
Looking for a specific ZIP?
Seasonal electrical checklist for Rochester homeowners
Spring
- Test every GFCI outlet (kitchen, baths, garage, exterior) using the on-device test/reset button.
- Test smoke and CO detectors; replace batteries on any unit older than 10 years.
- Inspect outdoor lighting and replace bulbs and weatherproof gaskets that have degraded over winter.
- Walk the panel: look for rust, scorch marks, or warm breakers — any of these is a service call.
Summer
- Inspect the exterior service drop and the meter base for storm damage; never touch the wires yourself.
- If you run multiple high-draw appliances (window AC, EV charger, pool pump), have an electrician verify your panel can handle the simultaneous load.
Fall
- Test the whole-home surge protector (or have one installed before winter storms).
- Inspect generator transfer switch and run the generator under load for 20 minutes.
- Replace outdoor incandescent bulbs with LEDs before holiday-light season.