★ Trusted by 84,000+ homeowners — verified contractor reviews Need a pro now? 1-888-555-FIXR

HomeCitiesSaint Petersburg, FL › Electrical

⚡ Electrical · Saint Petersburg

Average Electrician Cost in Saint Petersburg, FL

A electrician in Saint Petersburg charges roughly $83/hour — driven by the BLS OEWS national mean hourly wage of $34.40 for SOC 47-2111, the FL cost-of-living index of 100.7, and the standard 2.4× contractor markup. Below: project-by-project pricing, then 3 licensed local pros.

Electrician prices in Saint Petersburg, FL

ProjectTimeTypical costRange
Standard service call (diagnosis + minor repair) 1–2 hours $175 $144 – $210
Add a new outlet (15–20 amp, dedicated) 1–3 hours $202 $165 – $242
Ceiling fan install (existing wiring) 1–2 hours $191 $157 – $230
Panel upgrade (100A → 200A, includes permit) 1 day $1,939 $1,590 – $2,327
Level 2 EV charger install (50A circuit, hardwired) 4–6 hours $768 $630 – $922
Single room rewire (avg ~3 outlets + 1 fixture) 1 day $720 $591 – $864
Whole-house rewire (1500–2000 sq ft) 5–10 days $6,674 $5,473 – $8,009

Local rate = BLS national mean × 2.4 markup × (FL COL 100.7/100). Materials adjusted by the same factor.

What a electrician in Saint Petersburg actually does

A licensed electrician handles anything attached to the breaker panel or carrying line voltage (120V/240V). A standard residential service call begins with the panel: the electrician verifies the main breaker rating, looks for double-tapped breakers, checks for AFCI/GFCI compliance in the right rooms, and tests for proper grounding at the service drop. Outlet, switch, and fixture work is straightforward. Panel upgrades, sub-panel adds, EV-charger installs, and whole-house rewires require a permit, a load calculation (NEC Article 220), and an inspection by the local AHJ before the panel is energized.

Questions to ask before you hire in FL

  1. What is your master or journeyman license number, and is it active in this state?
  2. Will the work be done by a licensed electrician or by a helper with the licensee on call?
  3. Are you pulling the permit and scheduling inspection?
  4. Does the quote include any required panel-load calculations or breaker upgrades?
  5. What's the warranty on labor — and on the equipment you're installing?
  6. Are AFCI and GFCI breakers included where code now requires them?
Cash-only quotes, "I can do it without a permit so it's cheaper," and any pressure to upsize a panel without a written load calculation explaining why.

3 licensed electricians in Saint Petersburg

Five-Star Sparks

📍 2818 Hill Ct, Saint Petersburg, FL 33701
★ 5.0 / 5 · 59 reviews · 11 years in business
✓ Licensed ✓ Insured 11 yrs
Specialties: Panel upgrade, EV charger install, Knob-and-tube replacement, Ceiling fan, Whole-house rewire

Summit Amp Pros

📍 7537 Madison Rd, Saint Petersburg, FL 33704
★ 4.9 / 5 · 383 reviews · 30 years in business
✓ Licensed ✓ Insured BBB A- 24/7 Emergency 30 yrs
Specialties: Whole-house rewire, Ceiling fan, Recessed lighting

Powell Circuit

📍 6316 Elm Ave, Saint Petersburg, FL 33705
★ 4.7 / 5 · 111 reviews · 8 years in business
✓ Licensed ✓ Insured BBB A- 24/7 Emergency 8 yrs
Specialties: Smoke detector, Recessed lighting, Panel upgrade, Knob-and-tube replacement

Looking for a specific ZIP?

Seasonal electrical checklist for Saint Petersburg homeowners

Spring

  • Test every GFCI outlet (kitchen, baths, garage, exterior) using the on-device test/reset button.
  • Test smoke and CO detectors; replace batteries on any unit older than 10 years.
  • Inspect outdoor lighting and replace bulbs and weatherproof gaskets that have degraded over winter.
  • Walk the panel: look for rust, scorch marks, or warm breakers — any of these is a service call.

Summer

  • Inspect the exterior service drop and the meter base for storm damage; never touch the wires yourself.
  • If you run multiple high-draw appliances (window AC, EV charger, pool pump), have an electrician verify your panel can handle the simultaneous load.

Fall

  • Test the whole-home surge protector (or have one installed before winter storms).
  • Inspect generator transfer switch and run the generator under load for 20 minutes.
  • Replace outdoor incandescent bulbs with LEDs before holiday-light season.
📞 Get a Free Local Estimate →