Electrician prices in Wichita, KS
| Project | Time | Typical cost | Range |
| Standard service call (diagnosis + minor repair) |
1–2 hours |
$151 |
$124 – $182 |
| Add a new outlet (15–20 amp, dedicated) |
1–3 hours |
$174 |
$143 – $209 |
| Ceiling fan install (existing wiring) |
1–2 hours |
$166 |
$136 – $199 |
| Panel upgrade (100A → 200A, includes permit) |
1 day |
$1,677 |
$1,375 – $2,013 |
| Level 2 EV charger install (50A circuit, hardwired) |
4–6 hours |
$664 |
$545 – $797 |
| Single room rewire (avg ~3 outlets + 1 fixture) |
1 day |
$623 |
$511 – $748 |
| Whole-house rewire (1500–2000 sq ft) |
5–10 days |
$5,773 |
$4,734 – $6,928 |
Local rate = BLS national mean × 2.4 markup × (KS COL 87.1/100). Materials adjusted by the same factor.
What a electrician in Wichita actually does
A licensed electrician handles anything attached to the breaker panel or carrying line voltage (120V/240V). A standard residential service call begins with the panel: the electrician verifies the main breaker rating, looks for double-tapped breakers, checks for AFCI/GFCI compliance in the right rooms, and tests for proper grounding at the service drop. Outlet, switch, and fixture work is straightforward. Panel upgrades, sub-panel adds, EV-charger installs, and whole-house rewires require a permit, a load calculation (NEC Article 220), and an inspection by the local AHJ before the panel is energized.
Questions to ask before you hire in KS
- What is your master or journeyman license number, and is it active in this state?
- Will the work be done by a licensed electrician or by a helper with the licensee on call?
- Are you pulling the permit and scheduling inspection?
- Does the quote include any required panel-load calculations or breaker upgrades?
- What's the warranty on labor — and on the equipment you're installing?
- Are AFCI and GFCI breakers included where code now requires them?
Cash-only quotes, "I can do it without a permit so it's cheaper," and any pressure to upsize a panel without a written load calculation explaining why.
6 licensed electricians in Wichita
Apex Circuit
📍 3274 Willow Ave, Wichita, KS 67202
★ 5.0 / 5 · 270 reviews · 14 years in business
✓ Licensed ✓ Insured BBB A+ 24/7 Emergency 14 yrs
Specialties: Ceiling fan, Knob-and-tube replacement, Generator install
Wichita Wired
📍 5537 Jefferson Ter, Wichita, KS 67214
★ 3.8 / 5 · 7 reviews · 19 years in business
✓ Licensed ✓ Insured BBB A 24/7 Emergency 19 yrs
Specialties: Panel upgrade, Recessed lighting, Smoke detector, Generator install, Ceiling fan
Wichita Electrical
📍 8767 Cherry Blvd, Wichita, KS 67211
★ 4.4 / 5 · 76 reviews · 12 years in business
✓ Licensed ✓ Insured BBB A 24/7 Emergency 12 yrs
Specialties: Whole-house rewire, Smoke detector, Panel upgrade, Outlet install
Pacific Current
📍 6032 River Ct, Wichita, KS 67202
★ 4.8 / 5 · 98 reviews · 36 years in business
✓ Licensed ✓ Insured BBB A- 24/7 Emergency 36 yrs
Specialties: Generator install, EV charger install, Ceiling fan, Outlet install
Wichita Current
📍 2136 Hill Rd, Wichita, KS 67214
★ 5.0 / 5 · 397 reviews · 20 years in business
✓ Licensed ✓ Insured 24/7 Emergency 20 yrs
Specialties: Smoke detector, Recessed lighting, Ceiling fan
Wichita Electrical Co.
📍 4998 Main Ln, Wichita, KS 67211
★ 4.9 / 5 · 102 reviews · 30 years in business
✓ Licensed ✓ Insured BBB A- 30 yrs
Specialties: Whole-house rewire, Generator install, Surge protection, Panel upgrade, Outlet install
Looking for a specific ZIP?
Seasonal electrical checklist for Wichita homeowners
Spring
- Test every GFCI outlet (kitchen, baths, garage, exterior) using the on-device test/reset button.
- Test smoke and CO detectors; replace batteries on any unit older than 10 years.
- Inspect outdoor lighting and replace bulbs and weatherproof gaskets that have degraded over winter.
- Walk the panel: look for rust, scorch marks, or warm breakers — any of these is a service call.
Summer
- Inspect the exterior service drop and the meter base for storm damage; never touch the wires yourself.
- If you run multiple high-draw appliances (window AC, EV charger, pool pump), have an electrician verify your panel can handle the simultaneous load.
Fall
- Test the whole-home surge protector (or have one installed before winter storms).
- Inspect generator transfer switch and run the generator under load for 20 minutes.
- Replace outdoor incandescent bulbs with LEDs before holiday-light season.