Home › Providence › ZIP 02907 › Electrical
⚡ Electrical · ZIP 02907A licensed electrician serving ZIP 02907 charges roughly $91/hour, anchored on BLS OEWS wage data for SOC 47-2111 ($34.40/hr national mean) and the RI cost-of-living index of 110.7.
| Project | Time | Typical cost | Range |
|---|---|---|---|
| Standard service call (diagnosis + minor repair) | 1–2 hours | $192 | $158 – $231 |
| Add a new outlet (15–20 amp, dedicated) | 1–3 hours | $222 | $182 – $266 |
| Ceiling fan install (existing wiring) | 1–2 hours | $210 | $173 – $253 |
| Panel upgrade (100A → 200A, includes permit) | 1 day | $2,132 | $1,748 – $2,558 |
| Level 2 EV charger install (50A circuit, hardwired) | 4–6 hours | $844 | $692 – $1,013 |
| Single room rewire (avg ~3 outlets + 1 fixture) | 1 day | $792 | $649 – $950 |
| Whole-house rewire (1500–2000 sq ft) | 5–10 days | $7,337 | $6,017 – $8,805 |
A licensed electrician handles anything attached to the breaker panel or carrying line voltage (120V/240V). A standard residential service call begins with the panel: the electrician verifies the main breaker rating, looks for double-tapped breakers, checks for AFCI/GFCI compliance in the right rooms, and tests for proper grounding at the service drop. Outlet, switch, and fixture work is straightforward. Panel upgrades, sub-panel adds, EV-charger installs, and whole-house rewires require a permit, a load calculation (NEC Article 220), and an inspection by the local AHJ before the panel is energized.
Cash-only quotes, "I can do it without a permit so it's cheaper," and any pressure to upsize a panel without a written load calculation explaining why.